1. What are you looking at?
Typical Lakes Region wells run 200–500 ft. Hill-country towns like Sanbornton, Bristol and Tuftonboro tend deeper than valley ground around Tilton.
2. Ground conditions
3. Site access for the rig
4. Include the pump system?
The number that is not in this estimate is yield. You are paying for a hole; what you are buying is water, and nobody can tell you in advance how much the hole will produce. If a well comes in low, the remedies are hydrofracking, storage or deepening — all real, all costed separately. Any driller who quotes you a firm total with a guaranteed yield before starting is either padding heavily or setting up a conversation you will have later.
What Actually Drives the Number
Depth, which nobody knows in advance
The per-foot rate is the easy part. How many feet is a function of where the water is, and in granite that is a fracture question. Local experience narrows the range; it does not eliminate it.
Overburden depth
Steel casing has to run through the loose material above the rock and be grouted into the bedrock. Deep overburden means more casing, and casing is one of the more expensive components per foot.
Access
A rig that can drive onto the site is a different proposition from one that needs matting, tree work, or careful manoeuvring on a steep lot. On wooded Squam and Newfound properties this occasionally decides where the well goes.
The system, not just the hole
Pump, pressure tank, pitless adapter, wiring, and the trench and line back to the house. Frequently as much again as modest drilling, and it is the part people forget to budget.
What happens if yield is low
Hydrofracking, storage or deepening. Worth agreeing the approach before drilling starts rather than negotiating it at 400 feet with a rig on site.